By now, the siding work is almost complete. You can see the "olive" gable shakes that give a nice accent to the exterior.
The garage door has been installed as well.
And on the inside, the flooring work has begun. First item is the tile work in the bathrooms. The (electric) radiant floor heating mats have been set in the Master Bath. And shower wall as well as tub platform and surround have been tiled. The tile layers put down wrong tiles around the tub (will have to be corrected), but here is a photo of our shower wall:
The hardwoord floor material (strand bamboo) has been brought to the site as well. Most of our flooring area will be covered with this, so there are quite a few boxes:
No comments: