Showing posts with label Heating. Show all posts
Showing posts with label Heating. Show all posts

Monday, October 13, 2014

Day 126 : Tiles, hardwood flooring, pellet stove

I wrote about the tiling problem in the bathroom. Luckily, the problem has been corrected in the meantime. Here are the two versions (all black before and with the proper wall tiles after). The second version looks much nicer, doesn't it?



We learned that the kitchen cabinets will be delivered tomorrow, so the hardwood floor in the main living area had to be installed today (tiling work is still not completed). At the same time, the pellet stove has been delivered:


Wednesday, August 27, 2014

Day 78 : Heat pumps

Some more photos from the plumbing activities: Water is hooked up now (see the pressure tank) and the heat pumps are being installed. There will be a 1 ton (12,000 BTUs) pump on the basement floor and a 1.5 ton (18,000 BTUs) heat pump on the main floor.

Water supply pressure tank
Outdoor compressor units for the two mini split heat pumps
Indoor head of the main floor heat pump

Reference photo 2014-08-27