Sunday, September 14, 2014

Day 89 : Garage entry and exterior grading

Since most of the digging and exterior work has been completed, the ground has been graded close to the final elevations. Drain pipes for the gutters have been installed underground as well. For the 2 ft difference between garage and basement level, I and them build a stone wall with rocks from our lot (there are plenty of those rocks around). The area in from of the garage has been converted into a comfortable turnaround when backing out of the garage. Also, the last culvert on the driveway needed to be extended and its exit got embedded into a set of rocks as well.

See the result here: