Tuesday, July 29, 2014

Day 49 : We have a main floor!

It was a miserable day yesterday with pouring rain basically all day. So we did not bother to check the progress. But today (Tuesday, day 2 of framing work), we were very curious and went to the site again.

What a surprise: the crew installed the outside basement walls, some interior walls and even the main floor. So construction is moving along again and if the pace of framing continues, the structure should resemble a real house within a few days. This is exciting!


Reference photo, 2014-07-28

View from the main floor (master bedroom)
In the lower floor, looking west
Looking into the lower floor area from the southwest corner