Thursday, October 10, 2013

We are Online...

... and generating electricity!

It took until early October 2013 until the solar PV system went online. So we are finally in the business of making energy. What an exciting moment. I met with my fellow solar group members and the installer at the site on October 10 to get an introduction to the installation and monitoring system.


The group members with the installer's engineer

The GMP group net metering setup took some massaging, but we soon got it under control. The first few days of operation turned out to be very sunny, so we got off to a good start. Despite some early morning shadows on the array in Fall/Winter, we should be on target for our annual energy goal.

Two Rows with 66 Panels in Total

Soaking up the Sun

Monday, September 9, 2013

The Solar Array is Under Construction

To supply the energy needed for our mostly electric powered house, we decided to look into a solar PV array. It was planned to be constructed on the common land where the exposure to the sun is much better than on our own roof. After discussing the idea with neighbors in January of 2013, that plan grew into a larger community system with three partners initially (maybe more later). We talked to various installers and decided on a rack-mounted system of slightly over 20,000 kWh annual production capacity.

Permitting and planning took longer than expected and we moved the location due to neighbors' concerns in the end. We also had to set up a legally and financially sound member's agreement and form a LLC to run the system.

It took until September 2013 until construction of our community (net-metered) Solar Array finally began. Better late than never. Here are a few construction photos...









By now, we already learned that smaller electric utilities do not take on new group metered setups any more. They will not offer the 6c adder per kWh generated electricity and also offering much lower rates in general. This is bad news for Solar in Vermont as it makes the whole idea financially unattractive.
So it was not a bad idea to get started with that project long before the house went up.

UPDATE (May 2014): The VT legislation decided to increase the net metering limits from 4% to 15% of the utilities' capacity in their 2014 session. So  net metering will have a realistic chance to become mainstream. Go solar!

Sunday, August 4, 2013

Floorplan Evolution, August 2013

You may have read the May entry on the Floor plan Evolution topic. Well, this was a major stage in our own design. At that point, the architect we chose was involved already and there were many ideas going back and forth in early summer. Circular staircases, straight ones, around the corner stairs. Then different bathroom and walk-in closet designs, sauna locations an more. The only thing that seemed stable was the basic arrangement between kitchen, the dining room (corner bench on the southwest corner) and the living room (taking in the westerly views). Come to think of it, we have found this arrangement a while ago and stuck with it over the months. One example floor plan that inspired us was this:

Another milestone was reached in early August of 2013, after we had a meeting with architect and builder on our porch in Williston. The below floor plan is the architect's implementation of all the ideas and discussion so far.

In hindsight, this version proved to be very stable. I am actually writing this blog in January 2014 and we still use this exact floor plan. There will likely be more changes by the time we build, but overall, this is what our future home will look like!

Floorplan Main Floor (August 2013)

Floorplan Basement (August 2013)


Elevations (August 2013)

Thursday, May 30, 2013

Floorplan Evolution, May 2013

Over the course of Fall 2012 to Summer 2013, there were countless iterations of our floor plan. Too many to list them all here. But I'd like to at least mention the major stages we went through.

One major concern was cost, of course. But besides that it was how a particular floor plan would work in terms of the thermal envelope. I already mentioned that we dropped the cathedral ceiling idea because of energy aspects, but there is more. One fundamental principle is to reduce wall space. From basic geometry, we know that the best perimeter to area ratio is offered by a circle. Since a round house is not  our preferred solution and it would be impractical to build, the next best thing is a square. Non-square rectangles are already less optimal, and every corner, every wing or addition makes a house less energy efficient due to the increased wall space. So a basic rectangular footprint (as close to square as possible) should be the target for any energy efficient house. External additions that are not in the thermal envelope like garages, porches etc. are OK though. When talking about the horizontal thermal insulation, window area (and window types) is another topic. But I will save that for later.

The next step is the in the thermal insulation towards the roof. While there are methods of properly insulating the roof itself (when using attic space or having a second floor like in a cape style house with at least partial slanted ceilings), it adds cost and the need for spray foam or other non-recycled material.
Avoiding the use of the attic all together allows for simply putting many inches of loosely packed cellulose on top of your (flat) ceiling of the main or upper floor. That is basically what we did in yet another evolution step: Instead of adding guest quarters and office space under the roof, we moved these rooms into the basement. After some cost discussions, we even decided against finishing the space under the roof in the future, so that a simple truss design can be used.

Here's the status of May 2013 (actually, one of the many options under investigation; this particular one was using s straight staircase to the lower floor):

Main Floor (May 2013) 
Basement (May 2013)

West Elevation (May 2013)

Sunday, April 21, 2013

Redefining Priorities

After some back and forth between architect, the builder and us, it soon became
clear, that the cost for a house with many angles, nooks and crannies
(especially when it comes to energy efficient building techniques) was
going to exceed our budget.

So basically, we could build cheaper (meaning not as energy efficient)
or go to a simpler, maybe smaller design. It was a clear decision: No
compromises with respect to energy efficiency!

So we went back to the drawing board, spend the good part of a weekend
to figure out whether a simpler, rectangular design could work as well.
Circular stairs were being discussed, but basically shot down by our architect.
In the end, we kept the basic ideas of the main floor with a central
staircase, but were able to squeeze it into a 34x42 footprint (basically
~1200sf on main floor). Picking up on the concept of a South Farm house
in Hinesburg that we visited, we also moved the second
floor rooms into the basement, occupying about 50% of the space down
there. So we could save on finishing the whole 2nd floor as well as
using a simpler base shape.

Another cost factor was the detached garage: A separate structure with
connector to the main house would have been much more than an integrated
solution. We did not like the idea of building the garage later, as this
did not eliminate or reduce the total cost, only postponed them.

Friday, November 30, 2012

Initial Design Studies

We came a long way in terms of design ideas over the course of the years. When we first started looking for a lot in the 2004 timeframe, our plan was for a 2200+ sf house with cathedral ceiling, full 2nd floor and basement, in total having even more volume as the Williston house. This was based on a Timberframe plan book from the Garlinghouse company, mixed with some of our own ideas.

West Elevation of 2004 Design Idea



The more recent design ideas came from the Dakota plan of Timberblock, a Canadian company building R30 designs with wood beams having a foam core, the looks almost like log homes. It was still using an open, cathedral ceiling living room, but the scale was much smaller, already below 2000sf. Still too big for Doris who was more aiming for 1600sf.

Timberblock Dakota Model
Dakota 1st Floor
Dakota 2nd Floor

It all evolved from there. The first thing that everyone suggests when it comes to energy efficiency is to drop the cathedral ceiling. It was a hard decision, giving up on this grand living room design,  but a 9' ceiling with big windows should still feel roomy enough.

So we scaled down to a 1 1/2 floor design (using ~60% of the footprint in the upper floor for a 2nd bed/bathroom, office and sauna). That was the state at the end of 2012. It turned out that there would be many more updates in the coming months.


Saturday, September 22, 2012

The Quest for the Perfect Lot

During my AirBnB activities, we met two very nice ladies in Warren, both real estate agents themselves. When we causally mentioned that we were looking for a building lot (not really serious at that point), they pointed us to a lot on the market along East Warren Road. This particular one did not work out for us, but it woke our interest to get more serious. Our ideal lot would be in the order of 5 acres, slightly sloping with some woods in the back and enable some southern or westerly views. We first explored the Mad River Valley area. We then ventured to Waterbury, Moretown, Ferrisburgh, etc. We saw some nice lots, but nothing really satisfied the both of us completely. But our agent said not to worry, we will know when we find the right lot because "our heart will sing". And she was right! 

By late summer 2012, we already convinced ourselves that we still have to commute to Essex Junction for a while. The Mad River Valley, as nice as the area is, was simply too far out. So we looked into Chittenden County again, first Bolton and Underhill, then further north. One day, I dug up some listings of land in Westford. We made an appointment with the listing agent on Saturday, Sept. 22, 2012 to check out the available lots.

It was a sunny, but windy day and we walked around the whole parcel of this small development of five building lots. It turned out that we fell in love with one of the lots (the first lot was already under contract). It is a 5 acre piece of land, with some woods and open meadow, the main exposure is facing west, the land is slightly sloping and bordered by a river below. In addition, there is a lot of common land around. Perfect!


Walking the building lot for the first time



Despite some initial noise concerns we went ahead and made an offer for the building lot. A slightly adjusted offer was then accepted by the seller. Of course there were a few hickups along the way (nothing is as simple as it should be). But with the help of our attorney and real estate agent, we could get the legal aspects clarified and the contract to be acceptable to both parties.

So we closed on the lot in November of 2012. We decided to use the lower tax rate for a building completion within two years. Let's hope we make it!