This is the week where Huntley Road is closed at the southern end due to a culvert installation. The way to the site from Essex and Jericho is a few miles longer. That and the bad weather on Wednesday kept us from going there more often this week.
I have checked the progress on Tuesday evening, but nothing much happened since Saturday. Only the deck over the garage has been completed at that time:
Wednesday was a complete washout I thought (constant rain, heavy at times), but obviously someone was working on the porch (or three season room). It was shortly after noon when I got there today (Thursday) and the main porch structure was up and a reduced crew was working on the roof trim already.
At the same time, another team installed the asphalt shingles on the main roof. We picked a light grey color to keep the roof cool in the summer (and help slow down Global Warming).
In the meantime, our triple pane PVC windows have arrived! Well, most of them with the exception of the tempered ones, which will be delivered next week. But the framing crew focussed on the porch roof, so that the shingles can be installed there as well. So the windows (and patio doors) have been placed into the garage for the time being.
I also met the plumbing crew and we discussed duct locations. It is amazing how many details are still left open even after a very good set of architectural plans...
|
Reference Photo 2014-08-14 |